Table 5.1        Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

 

NA

 

Noise

 

NA

 

Water Quality

17 June 2020

Observation:

Manholes should be covered to prevent silt and construction materials.
(Zone 4)

24 June 2020

24 June 2020

Observation:

Manholes should be proper covered to prevent silt and construction materials direct discharge.

(Zone4)

24 June 2020

12 August 2020

Reminder:

Sand bags should be provide to prevent construction run-off.

NA

Chemical and Waste Management

20 August 2020

Observation:

The Contractor should clear up the waste to prevent accumulated.

26 August 2020

 

Land Contamination

 

NA

Landscape and Visual Impact

NA

General

NA

Permit / Licenses

 

17 June 2020

 

Reminder:

The contractor was reminded the EP and CNP should be provided on the site.

(Zone4)