6.1.1
Seven Action Level exceedance for 24-hr TSP
were recorded in the reporting period. Two exceedance were recorded at KER1 on 23
December 2020 and 20 January 2021. Five exceedance were recorded at KTD2c on 4,
14, 20 and 26 January 2021 and 1 February 2021.
6.1.2
A Limit Level exceedance for 24-hr TSP was
recorded in the reporting period. An exceedance was recorded at KTD2c on 29
December 2020.
6.1.3
No Action / Limit Level exceedance for 24-hr
TSP at KTD1 were recorded in the reporting period.
6.1.4
A Limit Level exceedance for construction noise
was recorded. Exceedance was recorded at KER1 on 30 December 2020.
6.1.5
No Action / Limit Level exceedance was recorded
for construction noise at KTD1 and KTD2c in the reporting period.
6.1.6
Number of exceedance in the reporting period
was summarized in Table 6.1.