8.1.1
Seven Action Level exceedance for 24-hr TSP
were recorded in the reporting period. Two exceedance were recorded at KER1 on
23 December 2020 and 20 January 2021. Five exceedance were recorded at KTD2c on
4, 14, 20 and 26 January 2021 and 1 February 2021.
8.1.2
A Limit Level exceedance for 24-hr TSP was
recorded in the reporting period. An exceedance was recorded at KTD2c on 29
December 2020.
8.1.3
No Action / Limit Level exceedance for 24-hr
TSP at KTD1 were recorded in the reporting period.
8.1.4
A Limit Level exceedance for construction noise
was recorded. Exceedance was recorded at KER1 on 30 December 2020.
8.1.5
No Action / Limit Level exceedance was recorded
for construction noise at KTD1 and KTD2c in the reporting period.
8.1.6 16 weekly environmental
site inspections were carried out in the reporting period. No recommendations
on mitigation measures was given to the Contractor for remediating the
deficiencies identified during the site inspections.
8.1.7 16 weekly Landscape and Visual Site audits were
carried out on in the reporting period and 8 of them were carried out by a
Registered Landscape Architect in the reporting period. The weekly Landscape
and Visual Impact reports were counter-signed by IEC as according to the
requirement of EM&A Manual (AEIAR-130/2009). No non-compliance was recorded
in the weekly Landscape and Visual Site audits in the reporting period.
8.1.8
Referring
to the Contractor’s information, no complaints, notification of summons and
successful prosecution was received in the reporting period.
8.2.1 The recommended environmental mitigation measures,
as proposed in the EIA reports and EM&A Manuals shall be effectively
implemented to minimize the potential environmental impacts from the Project. The
EM&A programme would effectively monitor the environmental impacts generated
from the construction activities and ensure the proper implementation of
mitigation measures.
8.2.2 According to the environmental audit performed in
the reporting period, the following recommendations were made:
Air Quality Impact
l No
specific observation was identified in the reporting period.
Construction Noise Impact
l No
specific observation was identified in the reporting period.
Water Quality Impact
l No
specific observation was identified in the reporting period.
Chemical
and Waste Management
l No
specific observation was identified in the reporting period.
Land Contamination
l No
specific observation was identified in the reporting period.
Landscape and Visual Impact
l No
specific observation was identified in the reporting period.
General Condition
l No
specific observation was identified in the reporting period.
Permit / Licenses
l No
specific observation was identified in the reporting period.