Summary
of Site Audit in the Reporting Month
|
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
||
|
Air Quality |
21 June 2018 |
Unused construction materials and construction wastes should be
removed or covered properly (Zone 1 and Zone 2). |
The item was rectified by the Contractor and inspected on
28 June 2018. |
||
|
Noise |
NA |
||||
|
Water Quality |
14 June 2018 |
Contractor was reminded that the surrounding of discharge
point be kept clear of silt, dusty or muddy materials (Portion I). |
The item was rectified by the Contractor and inspected on
21 June 2018. |
||
|
Chemical and Waste Management |
21 June 2018 |
Unused construction materials and construction wastes should be
removed or covered properly (Zone 1 and Zone 2). |
The item was rectified by the Contractor and inspected on
28 June 2018. |
||
|
Land Contamination |
NA |
||||
|
Landscape and Visual Impact |
21 June 2018 |
Unused construction materials and construction wastes should be
removed or covered properly (Zone 1 and Zone 2). |
The item was rectified by the Contractor and inspected on
28 June 2018. |
||
|
General Condition |
NA |
||||