10.         Conclusions

 

10.1.1   24-hour TSP impact monitoring and construction noise monitoring were carried out in the reporting month, no Action / Limit Level exceedance was recorded during the period.

 

10.1.2   No complaint of air quality was received. Therefore, no impact 1-hour TSP monitoring was conducted in the reporting month.

 

10.1.3   Four environmental site inspections were carried out in the reporting month. Recommendations on mitigation measures on water quality, air quality and chemical and waste management and landscape and visual impact were given to the Contractor for remediating the deficiencies identified during the site inspections.

 

10.1.4   Four weekly Landscape and Visual Site audits were carried out on 5, 12, 19 and 26 September 2018 and two of them, 12 and 26 September 2018 were carried out by a Registered Landscape Architect in the reporting month. The weekly Landscape and Visual Impact reports were counter-signed by IEC as according to the requirement of EM&A Manual (AEIAR-130/2009).

 

10.1.5   Referring to the Contractor’s information, no environmental complaint, notification of summons and successful prosecution was received in the reporting month.

 

 

10.2       Comment and Recommendations

 

10.2.1   The recommended environmental mitigation measures, as proposed in the EIA reports and EM&A Manuals shall be effectively implemented to minimize the potential environmental impacts from the Project. The EM&A programme would effectively monitor the environmental impacts generated from the construction activities and ensure the proper implementation of mitigation measures.

 

10.2.2   According to the environmental audit performed in the reporting month, the following recommendations were made:

 

Air Quality Impact

l   Watering on dusty materials should be carried out regularly for dust suppression.

l   The sheeting of stockpile should be check after typhoon weather.

 

Construction Noise Impact

l   No specific observation was identified in the reporting month.

 

Water Quality Impact

l   Sediments inside the sedimentation tank should be removed regularly.

 

Chemical and Waste Management

l    Chemical containers should be placed in drip tray.

 

Land Contamination

l    No specific observation was identified in the reporting month.

 

Landscape and Visual Impact

l   Check and properly cover all stockpiling after typhoon.

 

General Condition

l   No specific observation was identified in the reporting month.

 

Permit / Licenses

l   No specific observation was identified in the reporting month.