Summary
of Site Audit in the Reporting Month
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
||
Air Quality |
5 September 2018 |
Observation 1: Contractor should water the dusty material regularly. (Zone 1) |
The item was rectified by the Contractor and inspected on
12 September 2018. |
||
26 September 2018 |
Reminder 2: Contractor was reminded to check the sheeting of
stockpile after typhoon (Zone 1). |
NA |
|||
Noise |
NA |
||||
Water Quality |
19 September 2018 |
Reminder 1: Contractor was reminded to clear the sediments accumulated in
sedimentation tank regularly. (Zone 1) |
NA |
||
Chemical and Waste Management |
26 September 2018 |
Reminder 1: Contractor was reminded to place chemical containers on drip tray
(Zone 3). |
NA |
||
Land Contamination |
NA |
||||
Landscape and Visual Impact |
26 September 2018 |
Reminder 2: Contractor was reminded to check the sheeting of stockpile after
typhoon (Zone 1). |
NA |
||
General Condition |
NA |
||||