Summary of Site Audit in the Reporting Month

 

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

5 September 2018

Observation 1:

Contractor should water the dusty material regularly. (Zone 1)

The item was rectified by the Contractor and inspected on 12 September 2018.

26 September 2018

Reminder 2:

Contractor was reminded to check the sheeting of stockpile after typhoon (Zone 1).

NA

Noise

NA

Water Quality

19 September 2018

Reminder 1:

Contractor was reminded to clear the sediments accumulated in sedimentation tank regularly. (Zone 1)

NA

Chemical and Waste Management

26 September 2018

Reminder 1:

Contractor was reminded to place chemical containers on drip tray (Zone 3).

NA

Land Contamination

NA

Landscape and Visual Impact

26 September 2018

Reminder 2:

Contractor was reminded to check the sheeting of stockpile after typhoon (Zone 1).

NA

General Condition

 

NA