6.1.1
Site
inspections were carried out weekly to monitor the implementation of proper environmental
pollution control and mitigation measures for the Project. A summary of the
mitigation measures implementation schedule is provided in Appendix J.
6.1.2
In
the reporting month, four site inspections were carried out on 4, 12, 18 and 26 April 2018. Two of them, held on 18
and 26 April 2018 were the joint
inspections with the IEC, ER, the Contractor and the ET.
6.1.3
No
outstanding issues were reported during the reporting month. Details of
observations recorded during the site inspections are summarized in Appendix
M.
6.1.4
All
the follow-up actions requested by Contractor’s ET and IEC during the site
inspections were undertaken as reported by the Contractor and confirmed in the
following weekly site inspection conducted during the reporting month.