TABLE OF CONTENTS

 

Executive Summary   1

1.       INTRODUCTION   Error! Bookmark not defined.

2.       AIR QUALITY   Error! Bookmark not defined.

3.       NOISE   Error! Bookmark not defined.

4.       LANDSCAPE AND VISUAL   Error! Bookmark not defined.

5.       WASTE MANAGEMENT   Error! Bookmark not defined.

6.       SITE INSPECTION   Error! Bookmark not defined.

7.       ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE   Error! Bookmark not defined.

8.       IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES   Error! Bookmark not defined.

9.       FUTURE KEY ISSUES   Error! Bookmark not defined.

10.     Conclusions   Error! Bookmark not defined.

 

 

FIGURES

Figure 1                 Project General Layout

Figure 2                 Air and Noise Monitoring Locations

 

LIST OF APPENDICES

 

Appendix A

Construction Programme

Appendix B

Project Organization Chart

Appendix C

Action and Limit Levels for Air Quality and Noise

Appendix D

Calibration Certificates of Monitoring Equipment

Appendix E

Environmental Monitoring Schedules

Appendix F

Air Quality Monitoring Data

Appendix G

Noise Monitoring Data

Appendix H

Event Action Plans

Appendix I

Waste Flow Table

Appendix J

Environmental Mitigation Implementation Schedule (EMIS)

Appendix K

Weather and Meteorological Conditions during Reporting Month

Appendix L

Cumulative statistics on Environmental Complaints, Notifications of Summons and Successful Prosecutions

Appendix M

Summary of Site Audit in the Reporting Month

Appendix N

Outstanding Issues and Deficiencies

 

 

Executive Summary

 

  i.   The Civil Engineering and Development Department HKSAR has appointed Fugro Technical Services Limited (FTS) to undertake the Environmental Team services for the Project and implement the EM&A works.

 

 ii.   This Monthly EM&A report presents the environmental monitoring and audit works for the period between 1 May and 31 May 2019. As informed by the Contractor, major activities in the reporting month were:

 

ž   Excavation and laying of drainage pipe and manhole;

ž   Excavation and ELS construction.

ž   Construction of SUS structure;

ž   Construction of District Cooling System;

ž   Construction of Subway A;

ž   Construction of Subway B; and

ž   Construction of road base and road pavement.

 

Breaches of the Action and Limit Levels

 

iii.   No Action / Limit Level exceedance was recorded for 24-hr TSP and construction noise at KTD1a, KTD2b and KER1b in the reporting month.

 

Complaint, Notification of Summons and Successful Prosecution

 

iv.   No environmental complaint, notification of summons and successful prosecution were received in the reporting month.

 

Reporting Changes

 

v.   There was no reporting change in the reporting month.

 

Future Key Issues

 

vi.   The key issues to be considered in the coming reporting month include:

           

Potential environmental impacts arising from the above construction activities are mainly associated with construction dust, construction noise, water quality, waste management and landscape and visual impacts.