5.1.1
Site inspections were carried out weekly to
monitor the implementation of proper environmental pollution control and
mitigation measures for the Project. A summary of the mitigation measures implementation
schedule is provided in Appendix F.
5.1.2
In the reporting quarter, 12 site inspections
were carried out. 6 of them were the joint inspections with the IEC, ER, the
Contractor and the ET.
5.1.3
From 20 July 2020 to 24 July 2020, due to the
suspected COVID 19 case from HMJV colleague, no site inspection was conducted
to reduce the risk of the spread of COVID 19.
5.1.4
All the follow-up actions requested by
Contractor’s ET and IEC during the site inspections were undertaken as reported
by the Contractor and confirmed in the following weekly site inspection
conducted during the reporting month.
5.1.5
Details of observations recorded during the
site inspections are presented in Table 5.1.