5.            SITE INSPECTION

 

5.1         Site Inspection

 

5.1.1     Site inspections were carried out weekly to monitor the implementation of proper environmental pollution control and mitigation measures for the Project. A summary of the mitigation measures implementation schedule is provided in Appendix F.

 

5.1.2     In the reporting quarter, 12 site inspections were carried out. 6 of them were the joint inspections with the IEC, ER, the Contractor and the ET.

 

5.1.3     From 20 July 2020 to 24 July 2020, due to the suspected COVID 19 case from HMJV colleague, no site inspection was conducted to reduce the risk of the spread of COVID 19.

 

5.1.4     All the follow-up actions requested by Contractor’s ET and IEC during the site inspections were undertaken as reported by the Contractor and confirmed in the following weekly site inspection conducted during the reporting month.

 

5.1.5     Details of observations recorded during the site inspections are presented in Table 5.1.