Construction
Programme |
|
Project Organization Chart |
|
Action
and Limit Levels for Air Quality and Noise |
|
Graphical
Presentation of Monitoring Data |
|
Waste Flow Table |
|
Environmental
Mitigation Implementation Schedule (EMIS) |
|
|
|
|
|
i. The Civil
Engineering and Development Department HKSAR has appointed MateriaLab
Consultants Limited (MCL) to undertake the Environmental Team services for the
Project and implement the EM&A works.
ii. This is the nineteenth
Quarterly EM&A Report presents the environmental monitoring and audit works
for the period between 1 September 2020 and 30 November 2020. As informed by
the Contractor, major activities in the reporting period included:
September
2020 |
October
2020 |
November
2020 |
·
Utility laying ·
Construction of road base and road pavement ·
Landscape works – irrigation systems, tree and shrub planting ·
Laying Cable and Construction for Road Lighting |
·
Utility laying ·
Construction of road base and road pavement ·
Landscape works – irrigation systems, tree and shrub planting ·
Laying Cable and Construction for Road Lighting |
·
Utility laying ·
Construction of road base and road pavement ·
Landscape works – irrigation systems, tree and shrub planting ·
Laying Cable and Construction for Road Lighting |
Breaches of the Action and Limit Levels
iii.
Seven Action Level exceedance for 24-hr TSP were recorded in the
reporting period. Five exceedance were recorded at KTD2c on 14, 24 October 2020
and 11, 16, 21 November 2020. Two exceedance were recorded at KER1 on 24
October 2020 and 16 November 2020.
iv. A Limit Level exceedance for 24-hr TSP was
recorded in the reporting period. An exceedance was recorded at KTD2c on 5
November 2020.
v.
A Limit Level exceedance for construction noise was recorded. Exceedance
was recorded at KTD1 on 21 October 2020. No Action / Limit Level exceedance was
recorded for construction noise at KTD2c and KER1 in the reporting month.
Complaint, Notification of Summons and Successful Prosecution
vi. No environmental complaint and no
notification of summons and successful prosecution were received in the
reporting period.
Reporting Changes
vii. No reporting changes in the reporting
period.