3.1.1
To monitor and audit the implementation of landscape and visual
mitigation measures, 13 weekly Landscape and Visual Site audits were carried
out and 6 of them were carried out by a Registered Landscape Architect. The
weekly Landscape and Visual Impact reports were counter-signed by IEC as
according to the requirement of EM&A Manual (AEIAR-130/2009).
3.1.2 During the site audit on 21 June 2018, it
was observed that unused construction materials should be removed or covered
properly (Zone 1 and Zone 2).
3.1.3 During the site audit on 1 August 2018,
contractor was reminded to remove construction waste promptly (Zone 1).
3.1.4
No non-compliance was recorded in the weekly Landscape and Visual Site
audits in the reporting period.
3.1.5
Observations and recommendations during site audits are summarized in Table 5.1.