TABLE OF CONTENTS
2. SUMMARY
OF EM&A REQUIREMENTS AND MONITORING RESULTS
6. ENVIRONMENTAL
COMPLAINT AND NON-COMPLIANCE
7. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure 1 Project General Layout
Figure
2 Air and Noise Monitoring
Locations
LIST OF APPENDICES
|
|
|
|
i. The Civil
Engineering and Development Department HKSAR has appointed Fugro Technical
Services Limited (FTS) to undertake the Environmental Team services for the
Project and implement the EM&A works.
ii. This is the eleventh
Quarterly EM&A Report presents the environmental monitoring and audit works
for the period between 1 September 2018 and 30 November 2018. As informed by
the Contractor, major activities in the reporting period included:
September 2018 |
October 2018 |
November 2018 |
·
Excavation
and laying of drainage pipe and manhole; ·
Construction
of tunnel box structure; ·
Excavation
and ELS construction. |
·
Excavation
and laying of drainage pipe and manhole; ·
Excavation
and ELS construction; ·
Construction
of Supporting Underground Structure; and ·
Construction
of District Cooling System. |
·
Excavation
and laying of drainage pipe and manhole; ·
Excavation
and ELS construction. ·
Construction
of SUS structure; and ·
Construction
of District Cooling System. |
Breaches of the Action and Limit Levels
iii. No Action and Limit Level exceedance for
24-hr TSP and noise was recorded in the reporting period at all monitoring
stations.
Complaint, Notification of Summons and Successful Prosecution
iv. No environmental complaint and no
notification of summons and successful prosecution were received in the
reporting period.