Community

Q1 What is the design of Trunk Road T2?
This project is a dual two-lane trunk road of approximately 3.4 km long, with about 3.1 km in the form of a tunnel. It comprises of the Trunk Road T2 of approximately 3.0 km long (with about 2.7 km in the form of a tunnel) and the Cha Kwo Ling (CKL) Tunnel of approximately 0.4 km long.

Q2 What is the benefit of the construction of Trunk Road T2 and CKL Tunnel?
The Trunk Road T2 and the CKL Tunnel form the middle section of Route 6. They connect the CKR to the west and the main tunnel of the TKO-LTT to the east. Upon commissioning of the Route 6, the public can have a more convenient express access between Kowloon East and West and amongst the developments along the route. With the Project completed, it is estimated that the journey time during the peak hours between the western entrance/exit of the TKO-LTT, i.e. Lam Tin Interchange, and the eastern entrance/exit of the CKR, i.e. Kai Tak Interchange would be reduced from about 15 minutes to about 3 minutes.

Q3 What is the anticipated completion date?
2026.

Under Construction
"Track" is our periodic newsletter about the Trunk Road T2 and Cha Kwo Ling Tunnel. We will provide TWO versions of the newsletter with different size for download.

  • Community Liaison Centre - Kai Tak
    Address Junction of Cheung Yip Street and Lam Chak Street
    Location Map
    Opening Hours Monday – Friday: 09:00 – 13:30 / 14:30 - 18:00

    Saturday: 9:00 - 13:00

    Sunday and Public Holidays: Closed

    In view of the COVID-19 situation, visitors are requested to contact us at 6130 8155 in advance for the latest arrangement.


  • Community Liaison Centre – Cha Kwo Ling
    Under Preparation


  • The 1st Community Liaison Group (CLG) Meeting (Cha Kwo Ling) was held on 30 June 2020