TABLE OF CONTENTS
7. ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE
8. IMPLEMENTATION STATUS
OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure 1 Project General Layout
Figure 2 Air
and Noise Monitoring Locations
LIST OF
APPENDICES
Appendix A |
|
Appendix B |
|
Appendix C |
|
Appendix D |
|
Appendix E |
|
Appendix F |
|
Appendix G |
|
Appendix H |
|
Appendix I |
|
Appendix J |
|
Appendix K |
Weather and Meteorological Conditions during
Reporting Month |
Appendix
L |
|
Appendix M |
|
Appendix N |
|
|
|
i.
The
Civil Engineering and Development Department HKSAR has appointed MateriaLab
Consultants Limited (MCL) to undertake the Environmental Team services for the
Project and implement the EM&A works.
ii.
This
Monthly EM&A report presents the environmental monitoring and audit works
for the period between 1 January 2018 and 31 January 2018. As informed by the
Contractor, major activities in the reporting month were:
Excavation
and laying of drainage pipe and manhole;
Seawall
modification works;
Construction
of tunnel box structure;
D-wall
construction works;
Pumping
test; and
Excavation
and ELS construction.
Breaches of the Action and Limit Levels
iii. No Action / Limit Level exceedance was recorded
for 24-hr TSP and construction noise at KTD1a, KTD2a and KER1b in the reporting
month.
Complaint,
Notification of Summons and Successful Prosecution
iv. No environmental complaint, notification of
summons and successful prosecution were received in the reporting month.
Reporting Changes
v. There was no reporting change in the
reporting month.
Future Key Issues
vi. The key issues to be considered in the
coming reporting month include:
Potential
environmental impacts arising from the above construction activities are mainly
associated with construction dust, construction noise, water quality, waste
management and landscape and visual impact.