i. The Civil
Engineering and Development Department HKSAR has appointed MateriaLab
Consultants Limited (MCL) to undertake the Environmental Team services for the
Project and implement the EM&A works.
ii. This is the ninth
Quarterly EM&A Report presents the environmental monitoring and audit works
for the period between 1 March 2018 and 31 May 2018. As informed by the
Contractor, major activities in the reporting period included:
March 2018 |
April 2018 |
May 2018 |
· Excavation and laying of drainage pipe and
manhole; · Seawall modification works; · Construction of tunnel box structure; · D-wall construction works; · Pumping test; and · Excavation and ELS construction. |
· Excavation and laying of drainage pipe and
manhole; · Seawall modification works; · Construction of tunnel box structure; · D-wall construction works; · Pumping test; and · Excavation and ELS construction. |
· Excavation and laying of drainage pipe and
manhole; · Seawall modification works; · Construction of tunnel box structure; · D-wall construction works; · Pumping test; and · Excavation and ELS construction. |
Breaches of the Action and Limit Levels
iii. No Action and Limit Level exceedance for
24-hr TSP and noise was recorded in the reporting period at all monitoring
stations.
Complaint,
Notification of Summons and Successful Prosecution
iv.
A complaint received on 30 May 2018 referred from EPD regarding some
large stockpiles were found uncovered and dust emission was observed during
excavation (the site between Kai Fuk Road and Shing Cheong Road, Southwest of
Kowloon Bay International Trade & Exhibition Center).
v.
No notification of summons and successful prosecution were received in
the reporting period.